Construction Coordination (LOD 350)

BIM Coordination Services | Construction Coordination Design | Shop Drawing Level BIM | Engineering Clash Resolution

From Detailed Design to Construction-Ready Coordination

The Construction Coordination phase (LOD 350) represents the critical transition from detailed design development to fully coordinated construction documentation.

At Triple A Integrated Real Estate Services, we provide BIM-based Construction Coordination Services, LOD 350 Modeling, and Multidisciplinary Clash-Free Design Integration, ensuring that all architectural, structural, and MEP systems are fully coordinated before construction begins.

This phase is essential for eliminating design conflicts, reducing on-site risks, and ensuring a smooth transition from design to execution.

What is Construction Coordination (LOD 350)?

LOD 350 – Construction Coordination Level is a BIM level of development where building systems are not only defined and dimensioned, but also coordinated with other disciplines in a constructible and spatially accurate manner.

At this stage:

  • All building systems are fully coordinated in 3D
  • Spatial relationships between disciplines are resolved
  • Construction intent is clearly defined
  • Interfaces between structural, architectural, and MEP systems are validated
  • Model is suitable for shop drawings and construction preparation

LOD 350 is widely used in complex construction projects, high-rise buildings, infrastructure developments, commercial towers, hospitals, and large-scale real estate projects.

Our Engineering Approach

We apply international BIM coordination standards and advanced digital construction methodologies to ensure seamless integration between design and execution.

Our workflow integrates:

  • BIM-based coordination (ISO 19650 compliant)
  • Multidisciplinary engineering integration
  • Digital clash detection systems
  • Lean construction principles
  • Value engineering strategies

Our Construction Coordination Services

1. Multidisciplinary BIM Coordination

We integrate all disciplines into a unified BIM environment:

  • Architectural coordination
  • Structural coordination
  • Mechanical (HVAC) systems integration
  • Electrical systems coordination
  • Plumbing & drainage systems
  • Firefighting systems coordination
  • Smart building systems (KNX / IoT integration)

2. Clash Detection & Resolution

We proactively identify and resolve conflicts before construction:

  • 3D clash detection analysis
  • Spatial conflict identification
  • System overlap correction
  • Design optimization solutions
  • Engineering coordination reports

This process significantly reduces on-site rework, delays, and cost overruns.

3. Constructability Review

We ensure that the design is fully buildable:

  • Construction sequence analysis
  • Installation feasibility checks
  • Access and maintenance validation
  • Material and system compatibility
  • Site execution optimization

4. BIM LOD 350 Model Development

We deliver a fully coordinated BIM model suitable for construction execution:

  • Coordinated 3D BIM environment
  • Discipline-integrated model
  • Accurate spatial coordination
  • Construction-ready geometry
  • Data-rich model for execution planning

5. Shop Drawing Support

LOD 350 enables accurate preparation of:

  • Shop drawings
  • Installation drawings
  • Fabrication coordination
  • Contractor execution models
  • Field coordination documentation

Deliverables – LOD 350 Construction Coordination Package

Our Construction Coordination deliverables include:

  • Fully coordinated BIM LOD 350 model
  • Clash detection reports
  • Discipline coordination drawings
  • Constructability review report
  • Updated architectural and engineering drawings
  • Shop drawing support models
  • Coordination meeting reports
  • Issue resolution logs
  • Spatial validation documentation

Industries We Serve

  • High-rise residential towers
  • Commercial office buildings
  • Mixed-use developments
  • Hospitality & hotel projects
  • Healthcare facilities (hospitals, clinics)
  • Infrastructure projects
  • Industrial and complex engineering projects
  • Government and public buildings

Why Construction Coordination (LOD 350) is Critical

A strong LOD 350 coordination process ensures:

  • Significant reduction in site clashes
  • Lower construction rework costs
  • Improved construction efficiency
  • Faster project delivery timelines
  • Higher quality execution
  • Reduced RFIs (Requests for Information)
  • Better contractor coordination
  • Enhanced project predictability

This phase is essential before moving to:

  • Construction Documentation (LOD 400)
  • Fabrication Modeling
  • As-Built Documentation (LOD 500)

Our Philosophy

Construction success is not achieved on-site—it is achieved in coordination.

At Triple A, we ensure that every system, component, and discipline is fully aligned before construction begins, transforming complexity into clarity and reducing uncertainty in execution.