Construction Coordination (LOD 350)
BIM Coordination Services | Construction Coordination Design | Shop Drawing Level BIM | Engineering Clash Resolution
From Detailed Design to Construction-Ready Coordination
The Construction Coordination phase (LOD 350) represents the critical transition from detailed design development to fully coordinated construction documentation.
At Triple A Integrated Real Estate Services, we provide BIM-based Construction Coordination Services, LOD 350 Modeling, and Multidisciplinary Clash-Free Design Integration, ensuring that all architectural, structural, and MEP systems are fully coordinated before construction begins.
This phase is essential for eliminating design conflicts, reducing on-site risks, and ensuring a smooth transition from design to execution.
What is Construction Coordination (LOD 350)?
LOD 350 – Construction Coordination Level is a BIM level of development where building systems are not only defined and dimensioned, but also coordinated with other disciplines in a constructible and spatially accurate manner.
At this stage:
- All building systems are fully coordinated in 3D
- Spatial relationships between disciplines are resolved
- Construction intent is clearly defined
- Interfaces between structural, architectural, and MEP systems are validated
- Model is suitable for shop drawings and construction preparation
LOD 350 is widely used in complex construction projects, high-rise buildings, infrastructure developments, commercial towers, hospitals, and large-scale real estate projects.
Our Engineering Approach
We apply international BIM coordination standards and advanced digital construction methodologies to ensure seamless integration between design and execution.
Our workflow integrates:
- BIM-based coordination (ISO 19650 compliant)
- Multidisciplinary engineering integration
- Digital clash detection systems
- Lean construction principles
- Value engineering strategies
Our Construction Coordination Services
1. Multidisciplinary BIM Coordination
We integrate all disciplines into a unified BIM environment:
- Architectural coordination
- Structural coordination
- Mechanical (HVAC) systems integration
- Electrical systems coordination
- Plumbing & drainage systems
- Firefighting systems coordination
- Smart building systems (KNX / IoT integration)
2. Clash Detection & Resolution
We proactively identify and resolve conflicts before construction:
- 3D clash detection analysis
- Spatial conflict identification
- System overlap correction
- Design optimization solutions
- Engineering coordination reports
This process significantly reduces on-site rework, delays, and cost overruns.
3. Constructability Review
We ensure that the design is fully buildable:
- Construction sequence analysis
- Installation feasibility checks
- Access and maintenance validation
- Material and system compatibility
- Site execution optimization
4. BIM LOD 350 Model Development
We deliver a fully coordinated BIM model suitable for construction execution:
- Coordinated 3D BIM environment
- Discipline-integrated model
- Accurate spatial coordination
- Construction-ready geometry
- Data-rich model for execution planning

5. Shop Drawing Support
LOD 350 enables accurate preparation of:
- Shop drawings
- Installation drawings
- Fabrication coordination
- Contractor execution models
- Field coordination documentation
Deliverables – LOD 350 Construction Coordination Package
Our Construction Coordination deliverables include:
- Fully coordinated BIM LOD 350 model
- Clash detection reports
- Discipline coordination drawings
- Constructability review report
- Updated architectural and engineering drawings
- Shop drawing support models
- Coordination meeting reports
- Issue resolution logs
- Spatial validation documentation
Industries We Serve
- High-rise residential towers
- Commercial office buildings
- Mixed-use developments
- Hospitality & hotel projects
- Healthcare facilities (hospitals, clinics)
- Infrastructure projects
- Industrial and complex engineering projects
- Government and public buildings
Why Construction Coordination (LOD 350) is Critical
A strong LOD 350 coordination process ensures:
- Significant reduction in site clashes
- Lower construction rework costs
- Improved construction efficiency
- Faster project delivery timelines
- Higher quality execution
- Reduced RFIs (Requests for Information)
- Better contractor coordination
- Enhanced project predictability
This phase is essential before moving to:
- Construction Documentation (LOD 400)
- Fabrication Modeling
- As-Built Documentation (LOD 500)
Our Philosophy
Construction success is not achieved on-site—it is achieved in coordination.
At Triple A, we ensure that every system, component, and discipline is fully aligned before construction begins, transforming complexity into clarity and reducing uncertainty in execution.